Thursday 21 December 2006

Cranberry Foods - Derby
Frost protected 95m of stainless steel pipework by supping and installing our type VC constant wattage heating tape.

Monday 18 December 2006

Morris Lubricants Ltd - Shrewsbury
Supplied trace heating to maintain the external stainless steel pipework at +25°C.

Friday 15 December 2006

Reckitt Benckiser - Derby
ESH designed, supplied materials and labour to install and commission the trace heating for a vessel 3m dia x 3.6m tall to be maintained at 30°C.

Wednesday 13 December 2006

Eastry WWTW - Kent
Scope of work was to supply and install trace heating tape, lagging and cladding to provide frost protection to the following:

  • Inlet works
  • ABS pipework & valves, Safety Shower & Fernic Dosing Kiosk
  • ABS pipework & valve, PST 3
  • Ductile iron pipework, pumps and vales, Sandfilters
  • Stainless steel, ductile iron and ABS pipework, valve & filter

Friday 8 December 2006

Kingmill Hospital - Mansfield 
We supplied our type VC constant wattage heating tape to provide frost protection.
New Tesco Store - Livingston
Supplied tools and labour to install and commission the trace heating, lagging and cladding to frost protect the Adblue pipework.

Thursday 7 December 2006

Gist Ltd - Cumbernauld
Supplied materials and labour to install and commission the trace heating, lagging and cladding to the Adblue pipework within this large distribution centre.

Tuesday 5 December 2006

Eagle Centre - Derby




In this project we supplied and installed the Trace Heating for frost protection on the BCWS and LTHW services pipework within the basement area. The shopping centre ended up needing just under 2000m of heating cable in total.

Monday 4 December 2006

Nestle Purina - Suffolk
Within this pet food manufacturing plant we supplied and installed the trace heating tape to maintain 2", 3" and 4" stainless steel pipework at a temperature of 55 degrees C. With the pipework being both internal and external we needed to use VC30/1 and VC38/1 tapes to maintain the constant temperature throughout.
Newham STW - Truro
Within this Zone 1 Group IIB T3 Classification Hazardous Area, ESH supplied and installed trace heating to provide frost protection utilising ATEX approved self regulating tape in conjunction with ATEX approved air sensing thermostat units.

Wednesday 29 November 2006

Hopping Hill Primary School - Northampton 
ESH supplied and installed 100m of ESRSBOJ trace heating tape to maintain +5°C on the domestic cold water pipework.

Monday 27 November 2006

CPS Fuels LTD - Cambridgeshire
The project scope was to supply and install trace heating tape, insulation and cladding in order to maintain the pipework at +15°C. The 3" bio diesel pipework was in a Zone 1 Gas Group 11B Hazourdous Area.
Police Station - Leamington Spa
Supplied 240m of VC8/2 constant wattage heating tape to perform the duty of frost protecting the chilled water pipework.

Thursday 23 November 2006

11 Tudor Hill - Sutton Coldfield
ESH supplied, installed and commissioned the trace heating system to maintain the ceiling void DHWS pipework at 65°C and also to frost protect a 15mm pipe in the stores area.

Friday 17 November 2006

John Bull Confectioners - Bridlington 
Supplied 85m of FBT40/2 to maintain a pipe line between 60°C - 70°C.
Sunrise Senior Living - Solihull 
Supplied tools, materials and labour to install and commission the frost protection trace heating system for VT and CT heating, chilled water, BCWS and BHWS services. 242m of type VC constant wattage heating tape was required.

Wednesday 15 November 2006

Sunrise Senior Living - Cardiff
Supply and installed a frost protection trace heating system for the heating, chilled water and mains cold water pipework in two areas, plus a 2m hose point pipe.
Lady Elizabeth Hastings Church Of England School - Leeds
Supplied and installed H2OWAT55 self regulating heating tape to temperature maintain the hot water pipework at 55°C.

Tuesday 14 November 2006

Jemstock - London
Supplied and installed trace heating to frost protect the water mains from Discovery Dock to the Jemstock project.

Wednesday 8 November 2006

Oldham Community College
100m OF H2OWAT65 was supplied and installed to maintain the DHWS at 55°C together with accessories to purge the system weekly to sterilize & prevent the formation to Legionella.

Monday 6 November 2006

Abbey Primary School - Northampton
ESH supplied and installed trace heating to provide the frost protection on the BCWS, DHWS F+R and HTG F+R circuits. This required 750m of ESRSBOJ self limiting tape. We also supplied the labour to remove the existing trace heating, insulation & cladding from skid units and re-install as much as possible the insulation & cladding only replacing with new where required. 
Lea And Perrins - Worcester
Back to Lea And Perrins, this time to supply and install thermal insulation to the ground floor condensate pipework.

Thursday 2 November 2006

Mikrokom Slovenskp Sro - Slovakia
Designed and supplied 8 x 4.6M dish heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Wednesday 1 November 2006

Lea And Perrins - Worcester 
Supplied and installed the thermal insulation for the Worcester Sauce, Water and Steam pipework.

Monday 23 October 2006

Oilfield Electric Marine Inc - USA
Designed and supplied 400 x HZIGS1700 1700mm long 140w 240v, hazardous area, high temperature glass insulated heating tape suitable for temperatures up to 450°C.

Monday 9 October 2006

Lafarge Cement - Westbury 
Designed and supplied 3 x heating jackets - 1452w/110v 740mm square with a vertical pitch of 270mm cone shaped.

Monday 2 October 2006

Rhodia UK Limited - Oldbury
The project scope was to supply materials and labour to remove the existing cladding, insulation and trace heating, to then install new trace heating tape, insulation and cladding in order to maintain the pipework at the following temperatures: 

  • Formaldehyde overflow pipe at 60°C (no existing trace heating)
  • Formaldehyde tanker take-off pump station at 60°C (refurbishment)
  • Caustic soda transfer pipe at 30°C (refurbishment)

Friday 22 September 2006

West Yorkshire Police Custody Suite & Offices
Supplied and installed 155m of VC12/2 constant wattage heating tape to frost protect the police stations new custody suite & offices pipework.          

Thursday 14 September 2006

KP Foods - Leicestershire
For this crisp lovers dream project, ESH supplied and installed just over 200m of type SC constant wattage heating tape to provide frost protection.

Hartshill STW - Nuneaton
100m of ESRSBOJ self limiting heating tape was supplied and installed at the above site.

Monday 11 September 2006

49 The Bishops Avenue - Hampstead
ESH supplied 300m of H2OWAT55 self limited heating tape to this exceptional development in one of London's most prestigious residential addresses.    

Wednesday 6 September 2006

Pinderfields Hospital - Wakefield 
Supplied tools, materials and labour to install and commission a trace heating system to maintain the DHSW pipework at +60°C. Overall ESH installed over 145m of H2OWAT65 within the hospitals new nursery.

Friday 1 September 2006

Warrington Collegiate Business School
ESH supplied and installed a trace heating system to provide frost protection to the external HTG F&R, CWS and MCWS pipework. Over all 300m of VC12/2 constant wattage heating tape was required.

Tuesday 29 August 2006

Manchester Joint Hospitals

ESH supplied and installed trace heating for both frost protection and hot water temperature maintenance. In total 573m of constant wattage heating tape and 150m of self regulating tape was installed.

Thursday 24 August 2006

Newhall School - Sutton Coldfield
Provided frost protection to the roof pipework. In total we supplied and installed just over 100m of VC12/2 constant wattage heating tape.

Monday 14 August 2006

Opus 9 - Wednesbury
For this project we supplied and installed trace heating tape to provide frost protection to the roof pipework.

Tuesday 8 August 2006

Huntstown Waste Water Treatment Plant
ESH supplied and installed trace heating to a number of different vessel delivery points, including the sodium bisulphate, caustic soda, service water supply, waste transfer and aeration pipework.

Wednesday 2 August 2006

North Trafford College - Manchester

Supplied materials and labour to install and commission the trace heating system to provide frost protection to the chilled water pipework within this modern further education college.

Friday 28 July 2006

Kings Heath Primary School - Northampton
After supplying 54 pre-terminated leads we were then contracted to install the trace heating tape totalling 400m, onto the BCWS and DHWS pipework.

Wednesday 26 July 2006

Earl Spencer School - Northampton
ESH originally supplied 114 pre-terminated leads, totalling approximately 800m of trace heating tape to this project. We were then contracted to carry out the installation and commissioning of the trace heating systems, designed to frost protect the BCWS, DHWS F+R and HTG F+R circuits.

Wednesday 19 July 2006

Unit 3, Bolton Central Retail Park
30m of H2OWAT55 self limiting heating tape was supplied and installed to maintain the HWS at +55°C.

Monday 10 July 2006

Epson - Telford
ESH designed and supplied Epson with a large drum pump heating jacket.

Thursday 6 July 2006

Kraft Foods UK - Banbury
Within Kraft Foods Coffee Operation, ESH were contracted to frost protect the external mains cold water pipework aswell as to heat maintain the Caustic Line at +60°C.

Tuesday 4 July 2006

Oilfield Electric Marine Inc - USA
Designed and supplied 275 x HZIGS1400 1400mm long 100w 110v ATEX Certified Motor Winding Tapes.

Monday 3 July 2006

Kyre Park House - Tenbury Wells


At this 17th century house, set in thirty two acres of parkland, ESH supplied and installed trace heating tape to prevent the blocking of the parapet gutter from the build up of snow and ice formation.

Wednesday 28 June 2006

Fullerton WTW - Hants
The projoct scope: 

  • Temperature maintenance of 10.5m x 50mm UPVC ferric chloride pipework 
  • Frost protection of 10.2m x 15mm UPVC pipework 
  • Thermal insulation to be weatherproofed with polyisobutylene sheeting
  • Over-ride temperature control on the 50mm pipework
  • Adhesive aluminium foil tape to be installed between the heating tape and the plastic pipework.    

Friday 23 June 2006

Plot 1100 - Gloucester Business Park
Supplied materials and labour to install a trace heating system to maintain the DHWS at 55°C together with accessories to purge the system weekly to sterilize and prevent the formation of Legionella.

Thursday 22 June 2006

Grand Theatre - Leeds
ESH provided trace heating to frost protect both the AHU and DHWS pipework within the theatres rehearsal rooms. Supplied and installed 130m of H2OWAT55.      

Wednesday 21 June 2006

Andrew Corporation - USA
A busy start to the year for Andrew Corp meant a busy start of the year for ESH - designed and supplied another 64 x 3.7m dish heater panels.

Tuesday 20 June 2006

RSL Steeper LTD - Leeds
ESH supplied materials and labour to install the trace heating tape to provide frost protection to the Recirculation & Blow-down pipework.    

Monday 19 June 2006

Cattedown WTW - Plymouth
Supplied and installed FBTBOJ trace heating to frost protect Galv and plastic pipework.  

Thursday 15 June 2006

Newhall Primary School - Sutton Coldfield
Supplied a further 150m of VC8/2 to this project.       

Monday 12 June 2006

Southern Water Pennington STW
The project was to supply, install and commission trace heating and insulation (with aluminium cladding) to 1" washwater pipework.

Thursday 8 June 2006

Ward Leonard Electrical Company - USA
Designed and supplied 75 x HZIGS1400 1400mm long 100w 110v ATEX Certified Motor Winding Tapes.

Monday 29 May 2006

Kings Heath Primary School - Northampton
Similar to the Abby Primary School order - ESH supplied 54 pre-terminated FESRSBOJ tapes, comprising of 1 x 3pin plug, 1 x 3 pin socket, 2x cap and cable length.

Friday 26 May 2006

Kings Heath Primary School - Northampton
Similar to the Abby Primary School order - ESH supplied 54 pre-terminated FESRSBOJ tapes, comprising of 1 x 3pin plug, 1 x 3 pin socket, 2 x cap and cable length.

Thursday 25 May 2006

Abbey Primary School - Northampton
Supplied 66 pre-terminated FESRSBOJ tapes, comprising of 1 x 3pin plug, 1 x 3 pin socket, 2x cap and cable length.

Monday 22 May 2006

Caterpillar UK - Larne
ESH designed and supplied 48 x Battery pad heaters 1050mm long x 200mm wide C/W cold lead.

Thursday 18 May 2006

South West Water - Plymouth
Supplied and installed the trace heating system to maintain 70°C on 150m of 100mm diameter steel pipework. 

Wednesday 10 May 2006

National Grid - Partington 
The project scope was to supply and install trace heating tape, insulation and cladding to provide frost protection to 50mm stainless steel pipework within a Zone 1, Group 11b Classification T3 Hazordous Area. This job required 150m of TRACECO10/2 self limiting hazardous area heating tape.

Monday 8 May 2006

Hoddesdon Research Centre
372m of VC constant wattage heating tape was supplied and installed to provide frost protection to both the CHW and LTHW external pipework.

Thursday 4 May 2006

Spray Plant 2K Ltd - Leeds
Designed and supplied 4 large metal clad drum heaters 2000w 240v.

Tuesday 2 May 2006

HTD Heat Trace Inc - USA
Designed and supplied 100 x Vacuum bakeout heating jackets.

Tuesday 25 April 2006

New ASDA Store - Queensferry
Before this new ASDA store opened, ESH supplied and installed both trace heating and thermal insulation to perform the duty of frost protection.

Wednesday 19 April 2006

Unit A, Prologis Park - Hayes
ESH supplied and installed a temperature maintenance system at +55°C to 110m of HWS pipework.

Friday 14 April 2006

York District Hospital
Supplied materials and labour to install and commission heat tracing to provide frost protection to the existing pipe and glass traps.

Monday 10 April 2006

Oxford Grove Nursery Building - Bolton
Supplied, installed and commissioned the trace heating tape to maintain the hot water supply at 55°C.

Friday 7 April 2006

Andrew Corporation - USA
For the second time this year ESH designed and supplied 64 x 3.7m satellite dish heater panels in order to frost protect the dishes.

Thursday 6 April 2006

Project: Northampton PFI Schools
This project included 22 schools across Northampton all going through refurbishment . ESH supplied the materials to frost protect the schools BCWS and MCWS.

Monday 3 April 2006

New Freezer Centre - Corby
Supplied and installed trace heating to copper pipework around a large water tank.

Thursday 23 March 2006

Newhall School - Sutton Coldfield 
For this school project, ESH were contracted to supply and install trace heating to frost protect the external roof heating, hot and cold water service pipes. 420m of VC8/2 used in total. 

Wednesday 15 March 2006

Carlton Bolling College - Bradford
Supplied and installed a temperature maintenance system for the hot water pipework and also frost protected both the CWS and HTG F&R pipes. In total we needed 100m of H2OWAT65 and 181m of FBTBOJ10/2.

Tuesday 14 March 2006

Ferrybridge Power Station
Designed and supplied a large pump heating jacket 1.5kw 110v for a fuel oil system.

Friday 10 March 2006

Harvey Early Years Centre - Bolton
The project here was to trace heat the hot water pipework in order to maintain 55°C.

Thursday 9 March 2006

Glasgow Royal Infirmary 
ESH were contracted to investigate the faulty ramp heating system currently in place and to correct any issues.

Monday 27 February 2006

Andrew Corporation - USA
Designed and supplied 64 x 3.7m dish heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Thursday 23 February 2006

Drayton House - Drayton
Designed and supplied the materials for a large scale water leak detection system.

Wednesday 22 February 2006

Huby Water Treatment Works
Supplied and installed frost protection to the external PVC pipework.

Tuesday 21 February 2006

Direct Table Foods - Suffolk


For this large project, ESH supplied and installed 1150m of WinterTrace constant wattage heating cable to frost protect the sprinkler systems in the cold storage rooms.

Tuesday 14 February 2006

Caterpillar UK - Larne 
Designed and supplied 20 battery heater pads 1050mm x 200mm C/W with a 3000mm cold lead.

Friday 3 February 2006

Kraft Foods UK Ltd (now Monedelez International)
Now Europe's largest chocolatier and biscuit maker and second largest maker of candy and coffee, ESH's project was part of their 'Coffee Operation'. Here we supplied and installed Trace Heating for frost protection to the cold water pipework and also the temperature maintenance of the plastic caustic pipework.

Thursday 2 February 2006

Dungeness Nuclear Power Station
Supplied 150m of FBTBOJ10/1 to this industrial project.  

Tuesday 31 January 2006

Morrisons Store - Livingston 
Supplied and installed trace heating to frost protect the water pipework within this new store.

Thursday 26 January 2006

Morrisons New HQ - Bradford
At the new Morrisons HQ, ESH supplied and installed frost protection trace heating to 150m of 35mm copper, roof chiller pipework.     

Tuesday 24 January 2006

The Birches School - Manchester
Supplied and installed hot water maintenance trace heating, using H2OWATT65 self regulating tape.

Thursday 12 January 2006

Cambridge Technology Centre
Supplied 280m of FBT10/2 to provide frost protection on 54mm copper pipework.