Friday 28 July 2006

Kings Heath Primary School - Northampton
After supplying 54 pre-terminated leads we were then contracted to install the trace heating tape totalling 400m, onto the BCWS and DHWS pipework.

Wednesday 26 July 2006

Earl Spencer School - Northampton
ESH originally supplied 114 pre-terminated leads, totalling approximately 800m of trace heating tape to this project. We were then contracted to carry out the installation and commissioning of the trace heating systems, designed to frost protect the BCWS, DHWS F+R and HTG F+R circuits.

Wednesday 19 July 2006

Unit 3, Bolton Central Retail Park
30m of H2OWAT55 self limiting heating tape was supplied and installed to maintain the HWS at +55°C.

Monday 10 July 2006

Epson - Telford
ESH designed and supplied Epson with a large drum pump heating jacket.

Thursday 6 July 2006

Kraft Foods UK - Banbury
Within Kraft Foods Coffee Operation, ESH were contracted to frost protect the external mains cold water pipework aswell as to heat maintain the Caustic Line at +60°C.

Tuesday 4 July 2006

Oilfield Electric Marine Inc - USA
Designed and supplied 275 x HZIGS1400 1400mm long 100w 110v ATEX Certified Motor Winding Tapes.

Monday 3 July 2006

Kyre Park House - Tenbury Wells


At this 17th century house, set in thirty two acres of parkland, ESH supplied and installed trace heating tape to prevent the blocking of the parapet gutter from the build up of snow and ice formation.