Rhodia UK Limited - Oldbury
The project scope was to supply materials and labour to remove the existing cladding, insulation and trace heating, to then install new trace heating tape, insulation and cladding in order to maintain the pipework at the following temperatures: 

  • Formaldehyde overflow pipe at 60°C (no existing trace heating)
  • Formaldehyde tanker take-off pump station at 60°C (refurbishment)
  • Caustic soda transfer pipe at 30°C (refurbishment)