Monday 29 May 2006

Kings Heath Primary School - Northampton
Similar to the Abby Primary School order - ESH supplied 54 pre-terminated FESRSBOJ tapes, comprising of 1 x 3pin plug, 1 x 3 pin socket, 2x cap and cable length.

Friday 26 May 2006

Kings Heath Primary School - Northampton
Similar to the Abby Primary School order - ESH supplied 54 pre-terminated FESRSBOJ tapes, comprising of 1 x 3pin plug, 1 x 3 pin socket, 2 x cap and cable length.

Thursday 25 May 2006

Abbey Primary School - Northampton
Supplied 66 pre-terminated FESRSBOJ tapes, comprising of 1 x 3pin plug, 1 x 3 pin socket, 2x cap and cable length.

Monday 22 May 2006

Caterpillar UK - Larne
ESH designed and supplied 48 x Battery pad heaters 1050mm long x 200mm wide C/W cold lead.

Thursday 18 May 2006

South West Water - Plymouth
Supplied and installed the trace heating system to maintain 70°C on 150m of 100mm diameter steel pipework. 

Wednesday 10 May 2006

National Grid - Partington 
The project scope was to supply and install trace heating tape, insulation and cladding to provide frost protection to 50mm stainless steel pipework within a Zone 1, Group 11b Classification T3 Hazordous Area. This job required 150m of TRACECO10/2 self limiting hazardous area heating tape.

Monday 8 May 2006

Hoddesdon Research Centre
372m of VC constant wattage heating tape was supplied and installed to provide frost protection to both the CHW and LTHW external pipework.

Thursday 4 May 2006

Spray Plant 2K Ltd - Leeds
Designed and supplied 4 large metal clad drum heaters 2000w 240v.

Tuesday 2 May 2006

HTD Heat Trace Inc - USA
Designed and supplied 100 x Vacuum bakeout heating jackets.