New ASDA Store - Queensferry
Before this new ASDA store opened, ESH supplied and installed both trace heating and thermal insulation to perform the duty of frost protection.
Unit A, Prologis Park - Hayes
ESH supplied and installed a temperature maintenance system at +55°C to 110m of HWS pipework.
York District Hospital
Supplied materials and labour to install and commission heat tracing to provide frost protection to the existing pipe and glass traps.
Oxford Grove Nursery Building - Bolton
Supplied, installed and commissioned the trace heating tape to maintain the hot water supply at 55°C.
Andrew Corporation - USA
For the second time this year ESH designed and supplied 64 x 3.7m satellite dish heater panels in order to frost protect the dishes.
Project: Northampton PFI Schools
This project included 22 schools across Northampton all going through refurbishment . ESH supplied the materials to frost protect the schools BCWS and MCWS.
New Freezer Centre - Corby
Supplied and installed trace heating to copper pipework around a large water tank.