Fullerton WTW - Hants
The projoct scope: 

  • Temperature maintenance of 10.5m x 50mm UPVC ferric chloride pipework 
  • Frost protection of 10.2m x 15mm UPVC pipework 
  • Thermal insulation to be weatherproofed with polyisobutylene sheeting
  • Over-ride temperature control on the 50mm pipework
  • Adhesive aluminium foil tape to be installed between the heating tape and the plastic pipework.    

Friday 23 June 2006

Plot 1100 - Gloucester Business Park
Supplied materials and labour to install a trace heating system to maintain the DHWS at 55°C together with accessories to purge the system weekly to sterilize and prevent the formation of Legionella.

Thursday 22 June 2006

Grand Theatre - Leeds
ESH provided trace heating to frost protect both the AHU and DHWS pipework within the theatres rehearsal rooms. Supplied and installed 130m of H2OWAT55.      

Wednesday 21 June 2006

Andrew Corporation - USA
A busy start to the year for Andrew Corp meant a busy start of the year for ESH - designed and supplied another 64 x 3.7m dish heater panels.

Tuesday 20 June 2006

RSL Steeper LTD - Leeds
ESH supplied materials and labour to install the trace heating tape to provide frost protection to the Recirculation & Blow-down pipework.    

Monday 19 June 2006

Cattedown WTW - Plymouth
Supplied and installed FBTBOJ trace heating to frost protect Galv and plastic pipework.  

Thursday 15 June 2006

Newhall Primary School - Sutton Coldfield
Supplied a further 150m of VC8/2 to this project.       

Monday 12 June 2006

Southern Water Pennington STW
The project was to supply, install and commission trace heating and insulation (with aluminium cladding) to 1" washwater pipework.

Thursday 8 June 2006

Ward Leonard Electrical Company - USA
Designed and supplied 75 x HZIGS1400 1400mm long 100w 110v ATEX Certified Motor Winding Tapes.