Newhall School - Sutton Coldfield
For this school project, ESH were contracted to supply and install trace heating to frost protect the external roof heating, hot and cold water service pipes. 420m of VC8/2 used in total.
Carlton Bolling College - Bradford
Supplied and installed a temperature maintenance system for the hot water pipework and also frost protected both the CWS and HTG F&R pipes. In total we needed 100m of H2OWAT65 and 181m of FBTBOJ10/2.
Ferrybridge Power Station
Designed and supplied a large pump heating jacket 1.5kw 110v for a fuel oil system.
Harvey Early Years Centre - Bolton
The project here was to trace heat the hot water pipework in order to maintain 55°C.
Glasgow Royal Infirmary
ESH were contracted to investigate the faulty ramp heating system currently in place and to correct any issues.