Wednesday 15 March 2006

Carlton Bolling College - Bradford
Supplied and installed a temperature maintenance system for the hot water pipework and also frost protected both the CWS and HTG F&R pipes. In total we needed 100m of H2OWAT65 and 181m of FBTBOJ10/2.

No comments:

Post a Comment