2006 Project List

Wednesday, 10 May 2006

National Grid - Partington 
The project scope was to supply and install trace heating tape, insulation and cladding to provide frost protection to 50mm stainless steel pipework within a Zone 1, Group 11b Classification T3 Hazordous Area. This job required 150m of TRACECO10/2 self limiting hazardous area heating tape.
Posted by ESH Trace Heating Ltd at 04:53
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2006 (86)
    • ►  December (10)
    • ►  November (14)
    • ►  October (3)
    • ►  September (6)
    • ►  August (5)
    • ►  July (7)
    • ►  June (9)
    • ▼  May (9)
      • Kings Heath Primary School - Northampton Similar t...
      • Kings Heath Primary School - Northampton Similar t...
      • Abbey Primary School - Northampton Supplied 66 pre...
      • Caterpillar UK - Larne ESH designed and supplied 4...
      • South West Water - Plymouth Supplied and installed...
      • National Grid - Partington  The project scope was ...
      • Hoddesdon Research Centre 372m of VC constant watt...
      • Spray Plant 2K Ltd - Leeds Designed and supplied 4...
      • HTD Heat Trace Inc - USA Designed and supplied 100...
    • ►  April (7)
    • ►  March (5)
    • ►  February (7)
    • ►  January (4)

Contributors

  • ESH Trace Heating Ltd
  • Unknown
Simple theme. Theme images by mariusFM77. Powered by Blogger.